The Met Breuer
New York, New York

Design Architect: Beyer Blinder Belle Architects
Dates: 2015 

With input from the client (the Metropolitan Museum), Beyer Blinder Belle (BBB) took a light-touch approach to the renovation. Many of the existing finishes were cleaned, the existing lighting was repaired. The ticketing desk and the LED display on the primary wall of the lobby were designed by BBB.

Completed while Stefano Paci was at Beyer Blinder Belle Architects as Senior Architect (for Construction Documents phase only). See below for full list of project credits and contribution.

Project Credits

Design Team – Beyer Blinder Belle Architects (BBB):

Jack Beyer: Partner for Design and Project Management

Carolyn Straub: Associate Partner for Project Management

Miriam Kelley: Senior Associate

Brett Gaillard: Associate

Stefano Paci: Senior Architect

Consultants:

Mechanical, Electrical, Plumbing, Fire Alarm and Fire Protection: Kohler-Ronan Engineering

Acoustics: Jaffe-Holden

All images courtesy of Beyer Blinder Belle Architects